Dilek Springs Development Diary

Dilek Springs Resort Villa Layout Villa Specification

 

Sturgen Properties is proud to bring you the very first diary update. Gound clearing began last week and the foundation work is well underway. Please check the pictures from the very first update below starting 16.10.07

 

Ground preparation work

Ground preparation work ^
 

Cleared and ready

The site is cleared and ready ^
 

Marking out

Marking out begins ^
 

Hard base

Hard base level is formed ^
 

Shuttering

Shuttering work begins ^
 

Floor preparation

Floor preparation ^
 

DPC Membrane

High Grade DPC Membrane ^
 

DPC Membrane heat sealed and bonded

Heat sealed and bonded DPC ^
 

Final Insulation

Final Insulation laying ^
 

Concrete pour

Concrete pouring ^
 

Power floated base

Power floated base ^
 

Foundation Shuttering

Foundation shuttering ^
 

Ring Beam foundations

Ring Beam Foundations ^
 

Foundations Team

Foundations Team ^
 

Sturgen Properties brings our clients this unique development feature. Watch your dream Turkish Villa appear before your very eyes with every single detail documented and controlled by our professional build team directed from our Turkish office. Please visit this section for weekly updates.

 
 
 
 
 
Suite 5, Sturgen Buildings, 9-15 Queen Street, Belfast BT1 6EA, Northern Ireland       +44 02890 244 955       admin@sturgen.net

Site designed and built by Belfast web design specialists Inspired eBusiness Solutions